BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20220630T010000Z
DTEND:20220630T020000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Metro Transit Eastside Corridor Phase 2- ZOOM
DESCRIPTION:Community Information Session #2\n\nMetro has a plan to make it easier to get around\, including the Eastside Transit Corridor Phase 2 project\, which proposes an extension of the L Line (Gold) further east from its current terminus at Pomona Blvd and Atlantic Blvd in East Los Angeles.  \n\n Prior to the release of the Draft EIR\, Metro is hosting two (2) community information sessions to share details on the maintenance and storage facilities (MSF) and the Initial Operating Segment (IOS) options\, as well as information on how to participate in the Draft EIR review period.  \n\nCommunity Information Session #1
X-ALT-DESC;FMTTYPE=text/html:<p style="box-sizing: border-box\; overflow-wrap: break-word\; margin-top: 0px\; margin-bottom: var(--tec-spacer-3)\; font-size: var(--tec-font-size-4)\; line-height: var(--tec-line-height-2)\; color: rgb(20\, 24\, 39)\; font-family: &quot\;Helvetica Neue&quot\;\, Helvetica\, -apple-system\, BlinkMacSystemFont\, Roboto\, Arial\, sans-serif\; letter-spacing: 0.26px\; background-color: rgb(255\, 255\, 255)\;"><span style="color: rgb(20\, 24\, 39)\; font-family: &quot\;Helvetica Neue&quot\;\, Helvetica\, -apple-system\, BlinkMacSystemFont\, Roboto\, Arial\, sans-serif\; font-size: 13px\; font-style: italic\; font-weight: 700\; letter-spacing: 0.26px\; background-color: rgb(255\, 255\, 255)\;">Community Information Session #2</span><br />\n<span data-contrast="auto" style="box-sizing: border-box\;">Metro has a plan to make it easier to get around\, including the Eastside Transit Corridor Phase 2 project\, which proposes an extension of the L Line (Gold) further east from its current terminus at Pomona Blvd and Atlantic Blvd in East Los Angeles.&nbsp\;</span><span data-ccp-props="{&quot\;201341983&quot\;:0\,&quot\;335559739&quot\;:160\,&quot\;335559740&quot\;:259}" style="box-sizing: border-box\;">&nbsp\;</span></p>\n\n<p style="box-sizing: border-box\; overflow-wrap: break-word\; margin-top: 0px\; margin-bottom: var(--tec-spacer-3)\; font-size: var(--tec-font-size-4)\; line-height: var(--tec-line-height-2)\; color: rgb(20\, 24\, 39)\; font-family: &quot\;Helvetica Neue&quot\;\, Helvetica\, -apple-system\, BlinkMacSystemFont\, Roboto\, Arial\, sans-serif\; letter-spacing: 0.26px\; background-color: rgb(255\, 255\, 255)\;"><span data-contrast="auto" style="box-sizing: border-box\;">&nbsp\;Prior to the release of the Draft EIR\, Metro is hosting two (2) community information sessions to share details on the maintenance and storage facilities (MSF) and the Initial Operating Segment (IOS) options\, as well as information on how to participate in the Draft EIR review period.&nbsp\;</span><span data-ccp-props="{&quot\;201341983&quot\;:0\,&quot\;335559739&quot\;:160\,&quot\;335559740&quot\;:259}" style="box-sizing: border-box\;">&nbsp\;</span></p>\n\n<p style="box-sizing: border-box\; overflow-wrap: break-word\; margin-top: 0px\; margin-bottom: var(--tec-spacer-3)\; font-size: var(--tec-font-size-4)\; line-height: var(--tec-line-height-2)\; color: rgb(20\, 24\, 39)\; font-family: &quot\;Helvetica Neue&quot\;\, Helvetica\, -apple-system\, BlinkMacSystemFont\, Roboto\, Arial\, sans-serif\; letter-spacing: 0.26px\; background-color: rgb(255\, 255\, 255)\;"><span style="box-sizing: border-box\; font-weight: bolder\;"><span class="TextRun SCXW23551917 BCX0" data-contrast="auto" lang="EN-US" style="box-sizing: border-box\;" xml:lang="EN-US">Community Information Session #1</span></span></p>\n
LOCATION:Zoom Link: tinyurl.com/2p8vtwtu Call In Number: 213.338.8477 Meeting ID: 819 5786 7651
UID:e.1156.4107
SEQUENCE:3
DTSTAMP:20260523T142659Z
URL:https://www.montebellochamber.org/events/details/metro-transit-eastside-corridor-phase-2-zoom-06-29-2022-4107
END:VEVENT

END:VCALENDAR
